Oct.23.2023
         

Tango FLNG and Excalibur FSU on their way to start up first phase of Eni’s Congo LNG project

Tango floating liquefied natural gas (FLNG) and Excalibur floating storage unit (FSU) have set […]
The post Tango FLNG and Excalibur FSU on their way to start up first phase of Eni’s Congo LNG project appeared first on Offshore Energy.
Source: LNG World News