We recently finished the conceptual design of a gas processing facility expansion located in Africa. During the conceptual design were able to reduce the anticipated CAPEX of the project by greater than 40% and defer 95% of the investment for 4 years by evaluated a number of different technology options. The Lisbon Group was awarded the FEED for the selected concept.