May.11.2015
         

Origin progresses with BassGas MLE

Origin progresses with BassGas MLE

Origin Energy, as operator of the BassGas joint venture, informed that the Yolla-6 production well, had reached total depth of 3,653m MDRT (Measured Depth Below Rotary Table).

[[ This is a content summary only. Visit my website for full links, other content, and more! ]]…Read More