CONCEPT: Minimize operating costs over the facility lifecycle by implementing sound engineering principles and rigorous on-site analysis
OVERVIEW: The Lisbon Group team provided process engineering to reduce mono-ethylene glycol (MEG) losses. the root cause of this loss was identified within one week of our initial site visit through rigorous data analysis, site observations, and data collected on-site. As a result, MEG losses were reduced by more than 35%. Field activities were followed up with continued operational support, engineering, and QA / QC.
HIGHLIGHTS:
- MEG loss reduction by greater than 35%
- Reduced operating costs year over year by close to $1 MM
- Engineering, QA / QC, and turn-around planning
MARKETS SERVED:The facility serves as the primary natural gas source for the capital of Tanzania, Dar es Salaam.